Identity system · self-initiated
A tram and metro network for a mid-sized city. Vignelli's argument for the 1972 subway map was that a passenger underground does not need to know where they are. They need to know what comes next. Everything here follows from accepting that.
The name with its first letter replaced by an interchange marker taken off the diagram. The mark is a piece of the map rather than a badge stuck on top of it.
Primary lockup with the line stack
Every line runs at nought, forty five or ninety degrees. Distance is even between stations whatever the ground says. Press the toggle to see what the diagram is throwing away.
One hue per line and no hue used for anything else. Colour is not decoration here, it is the index, and every other surface in the system borrows it back from the diagram.
#E03A28Harbour to Eastgate. The oldest line.#0B63C5Airport to Old Quarter.#128C56North Park to the university.#F2B417The orbital. Runs both ways, all day.#7A4BB5Night service only, Friday and Saturday.One family, four weights, and no second typeface anywhere in the network. Vignelli held that a designer needs about six typefaces in a career, and a transit system needs one.
Every sign is an eight by six field. The name band occupies two rows and starts at the same column on a platform sign, a street totem and a vehicle side panel.
Signage module, eight by six
The same band runs from a platform sign to a pocket map to a departure board. Nothing is redrawn for a new format, only cropped to it.
Platform sign
Single ticket, 88 × 54 mm
Live times for every stop on the network, and a diagram that fits on a phone without pinching.
Plan a journeyWebsite
Departure board
Pocket map cover, A6
A diagram is a promise that the drawing is consistent. Each of these breaks the promise in a way a passenger cannot see until they are already on the wrong platform.